Wind Towers

DAVI four roll plate rolls along with the exclusive “High Productivity Package” is the clear leader, chosen by most of the top wind tower manufacturers to produce their wind tower cylinders and cones This system allows one operator to roll a wind tower cyliner, in semi-automatic mode, in as short as 10 - 15 minutes.