新闻
公司新闻
返回  
日/月/年
Increasing natural gas through GAZPROM pipelines manufactured on DAVI plate rolls

DAVI has recently delivered a custom automatic line, 6,3 mt(248,03 in.) plate bending system for the bending of pipes for natural gas transfer to GAZPROM Group, - the Ucraina natural gas supplier.

This special pre-stressed automatic line for pipelines will be positioned in one of the new facilities in Ucraina, located in the Dniepropetrovsk region. It will increase the production of pipes necessary for delivery of natural gas to Europe.

Kilometers of pipelines through Russia and Europe will be fabricated on the DAVI plate roll. This will reduce pipeline production, resulting with increased natural gas supply. More heat, and more natural gas, for all of us with the DAVI plate roll automatic system advantage.

产品
所有产品都经过仔细的质量控制,综合了Davi 集团之经验,可靠性与技术开发。
所有产品  
准备提交
准备交付?进入该区检查Davi 设备可能性
更多消息  
© Davi Promau Group - PI 02082500402